None
EN
Comment on NAVANTIA signs F-110 Frigates Construction Contract with Spanish MoD by GMV to supply SENDA navigation system for Spanish Navy future F-110 frigates - Naval News
['Naval News Staff']
Comments for Naval News
Navantia and the Ministry of Defense have signed today the contract for the construction of five F-110 frigates for the Spanish Navy.
The contract was signed by the Deputy Director of Acquisitions of Weapons and Material, Alfonso Torán; by the Director of Operations and Business of Navantia, Gonzalo Mateo and by the Commercial and Business Development Director of Navantia, Sofia Honrubia.
This new generation of F-110 frigates, whose construction will begin shortly in Ferrol, stands out for having its own Spanish design and a high degree of industrial and technological sovereignty.
The frigates will be equipped with a Spanish combat system, SCOMBA, developed by Navantia.
In addition to the workload for the Ferrol Shipyard, it will also generate activity in the Bay of Cadiz, through Navantia Sistemas with the development of the frigate’s combat system.
['construction'
'frigates'
'systems'
'ships'
'director'
'signs'
'spanish'
'mod'
'f110'
'sensors'
'system'
'navantia'
'contract'
'ship'
'addition']