Synergy Marine Group, in partnership with Karpowership, has completed the conversion of a 125,000 m3 liquefied natural gas (LNG) carrier into a floating storage and regasification unit (FSRU), the Karadeniz LNGT Powership Americas. The vessel was delivered at Seatrium’s Admiralty Yard in Singapore, marking a significant milestone in accelerating LNG-to-power deployment. Synergy administered the conversion on a turnkey, one-stop basis, from managing design to engineering, procurement, and site supervision. Also, the vessel is now capable for dual operations – regasifying LNG while simultaneously receiving LNG from carriers via ship-to-ship transfer. Converting a 30-year-old LNG carrier into a fully functional FSRU is an immense challenge, and we thank Karpowership for trusting us with this project.