None
ES
NamWater Dam Bulletin on Monday 15 September 2025
['Josef Sheehama', 'Guest Contributor']
Namibia Economist
Omatjenne Dam does not have abstraction facilities.
The dam contents are according to the latest dam basin surveys.
The inflow that is reflected in the bulletin does not take into account evaporation and abstraction of water.
* Transfer from Omatako to Von Bach took place.
** Transfer from Otjivero Main to Tilda Viljoen took place.
['15'
'does'
'transfer'
'abstraction'
'namwater'
'dam'
'2025'
'windy'
'wateran'
'indicates'
'took'
'water'
'bulletin'
'place']