Pannergy inaugurates 2nd phase of Miskolc district heating projectCanal in Miskolc, Hungary (source: flickr/ Artúr Herczeg, creative commons)Francisco Rojas 10 Sep 2014Pannergy informs that trial operations have commenced for the district heating at Miskolc City's centre with nearly 30 MW combined capacity installed. The mayor of Miskolc City of County Rank, Dr. Ákos Kriza joined the managing director of Miskolc Heat Distribution Ltd, László Nyíri and PannErgy Plc’s chief executive officer, Péter Tóth on 9 September to open the district heating center in Tatár Street, a constituent of the second phase of the Geothermal Project of Miskolc. With the implementation of the Project,trial operation can be commenced, and as a result heat will be supplied by the Company to the district heating areas of Miskolc City Center and the University District. The second phase of the project has involved the construction of a preinsulated line section between the district heating center in Tatár Street needed for system expansion and the Avas District Heating Center. Ltd, and alignment of their technical parameters in order to put continuous and safe heat feeding in place for the 2014 heating season.