Early work along Aynam Road will include riverside surveys followed by the removal of tarmac and footpath surfaces to prepare the area for piling and wall construction. To protect the public and the workforce, the riverside vehicle lane closure along Aynam Road has been reinstated today (Tuesday, August 11). A Sonic Rig will also be used near Nether Bridge to test ground conditions. Zohel Ali, Environment Agency project manager for Aynam Road, said: “Aynam Road is the final section of the Kendal Flood Risk Management Scheme in the centre of Kendal. The flood wall will be built on piled foundations where needed, with piling work due to start in October.