None
EN
ADC chairperson reviews seed access road works
['The Hans India', 'About The Author']
Andhra Pradesh Breaking News, Telangana News, Hyderabad News Updates, National News, Breaking News
Amaravati: Construction of Phase-2 and Phase-3 of the Seed Access Road, the principal connectivity corridor to Amaravati, is progressing rapidly, with Amaravati Development Corporation (ADC) chairperson and managing director D Lakshmi Parthasarathi reviewing the ongoing works on Tuesday.
During the inspection, she directed the construction agency to expedite the completion of the 110-metre-long, 18-metre-wide steel bridge over the Buckingham Canal at Undavalli.
She also inspected the 284-metre-long, 12-metre-wide steel bridge being built across the Kondaveeti Vagu and instructed officials to complete the approach road within the stipulated time frame.
Lakshmi Parthasarathi asked ADC Chief Engineer T Moses Kumar to accelerate the construction of the Seed Access Road stretch from the Manthena Satyanarayana Raju Ashram to the steel bridge over Kondaveeti Vagu under Phase-2.
Superintending Engineer T Vaikuntha Rao, Executive Engineer M Sridhar Reddy, Deputy Executive Engineer Y Appaji, and Senior Horticulture Consultant Vishwaprasad accompanied the ADC Chairperson during the inspection.