The 1875XL EVO. Image: TesmecThe Tesmec 1875XL EVO chainsaw trencher is proving its worth on a major Saudi Arabia gas pipeline project, excavating 20km of wide and deep trench through complex conditions in less than two months. The Tesmec 1875XL EVO sets the benchmark for this engineering approach. Tesmec is currently demonstrating the practical application of this approach in the field, having supplied multiple 1875XL EVO units for the Master Gas System Expansion Phase III (MGS III) in Saudi Arabia. As one of the largest gas pipeline infrastructure programs in the Middle East, the scale of the development requires consistent, high-volume trenching.