Segment 13 of connecting link work in Porcupine is on track to be done in October. The city’s manager of engineering, Scott Collin says a new sidewalk has been laid from the Porcupine Mall almost all the way to Crawford Street, and new lights are up. Water main work will continue towards the Porcupine River bridge. It’s about to switch to the north side of the road. As it’s been for a while, there will be one lane of traffic going each way, so a bit longer to get through the area than usual.