Heavy equipment continues to build control lines on the north flank, improving existing roads and assess control lines along the south flank. Ground crews continue to secure existing control lines along the north flank of the fire. “BC Wildfire Service continues to respond to this fire with BC Wildfire ground crews along with crews from Alberta and Quebec, local contractor crews, heavy equipment operators, as well as Fire Departments and aviation resources.” Aviation resources and heavy equipment will continue to support ground crews as needed.” The Cariboo Fire Centre currently has 14 active fires with 9 incidents in the past 7 days.