"The project is scheduled for connection to the national energy system in 2030, but at this point the grid still requires significant reinforcement. We are following every step and doing everything within our power to move forward," said Adrian Dobre, Country Manager at Eurowind Energy Romania. Initial story: Danish energy giant Eurowind Energy is reportedly preparing an investment of approximately EUR 450 million in a large-scale wind farm in Iași County, eastern Romania, according to local publication Apix.ro. Eurowind Energy has been active in Romania since 2011 and currently operates approximately 184 MW, including a 60 MW storage facility in Teiuș. radu@romania-insider.com(Photo source: Eurowind Romania on LinkedIn)