Subsequently, a field-level verification was conducted, and 301 eligible families were allotted 75-square-yard house sites in March along with sanctions under the Indiramma housing scheme. Construction activity at Velugumatla has gathered momentum, with beneficiaries simultaneously building their houses while the government undertakes infrastructure works. Meanwhile, demand for house sites in Velugumatla remains high, with nearly 8,000 applications received from families claiming long-term residence in the area. Housing officials said eligible applicants who have not yet been allotted house sites would be considered in subsequent phases. Housing Project Director Bhukya Srinivas said the administration is working to complete both housing and infrastructure works within the stipulated timeframe so that the colony can be formally inaugurated on December 9 as planned.