None
EN
Livingston Parish road project redesigned after 2016 flood now open to drivers
[]
WBRZ
Livingston Parish road project redesigned after 2016 flood now open to driversLIVINGSTON — A ribbon cutting was held for the Cook Road Extension project in Livingston Parish.
The road now connects Pete's Highway to Juban Road and is expected to help traffic flow around I-12.
The project dates back to 2014 and was redesigned after the 2016 flood to address drainage concerns and the height of the roadway.