The bridge, located over the St. Louis River at the junction of Minnesota Highway 39 and Wisconsin Highway 105, will close at 8:30 a.m. All equipment will be removed from the bridge and will be re-opened by 4:30 p.m.Our newsroom occasionally reports stories under a byline of "staff." Often, the "staff" byline is used when rewriting basic news briefs that originate from official sources, such as a city press release about a road closure, and which require little or no reporting. At times, this byline is used when a news story includes numerous authors or when the story is formed by aggregating previously reported news from various sources. If outside sources are used, it is noted within the story.