Omatjenne Dam does not have abstraction facilities. * Water was transferred from Swakoppoort Dam to Von Bach Dam. ** The Von Bach Dam water level is for Tuesday 04 August 2026. *** Transfer from Omatako Dam to Von Bach Dam took place using small pumps. **** Water transfer from Otjivero Main Dam to Tilda Viljoen Dam resumed on 01 August 2026.