The HCA sought a reasonable period to obtain approvals and commission the infrastructure and asked the tribunal not to initiate coercive action in the interim. Also Read Wasim Jaffer named HCA mentor, district academies plannedWhat the HCA proposedThe HCA said it was examining a technical proposal from Furaat Earth Private Limited for a modular and patented rainwater filtration and recharge system, intended to eventually make the stadium “water-positive.” The proposal includes wireless metres with a five-year battery backup to measure the quantity of rainwater harvested and reused. On its existing water storage, the HCA said the stadium has three facilities with a combined capacity of about 8.2 lakh litres. Despite subsequent directions on March 19, July 17 and October 13, 2025, the HCA failed to file its status report.