None
EN
Why lawmakers’ opposition puts Texas high-voltage power lines in doubt
['Keaton Peters', 'Keaton Is An Energy Reporter For Straight Arrow Based In Austin', 'Texas. He Focuses On Affordability', 'Economic Impacts In Coverage Of Energy Policy', 'How Data Centers Are Reshaping The Grid', 'Market Shifts For Oil', 'Gas', '.Wp-Block-San-Story-Byline Data-Display Bio', 'Container-Name Story-Byline Container-Type Inline-Size Display Flex Flex-Direction Column Gap Var --Wp--Preset--Spacing--Lg', '.Wp-Block-San-Story-Byline__Author Display Grid Grid-Gap Var --Wp--Preset--Spacing--Sm']
Straight Arrow News
Power lines planned across Texas face an uncertain future after Lt. Gov.
Dan Patrick called on the Public Utilities Commission of Texas to deny pending applications for high-voltage transmission lines.
The power lines have pitted the interests of the energy industry against ranchers and other private landowners.
Since lawmakers voted to build new transmission lines in 2023, Texas has seen a boom in data center proposals.
But the PUC process is already underway, and the agency does not answer to the lawmakers directly.