Calum Innes, Partner at Galbraith, said: “This is a productive hydro scheme with capacity in excess of 1MW and a proven track record. The scheme benefits from a substantial period of entitlement to Government support from the Feed-in Tariff scheme. Commissioned in December 2013 and located on the Glendoe Estate, near Fort Augustus on the south-east shore of Loch Ness, the scheme has a proven generation track record. Investment highlights :2.52GWh average annual generation;£700,000 anticipated operating profit 2027;1.022kW installed capacity - two Gilkes turbines (G1 and G2);Opportunity for additional revenues from private-wire arrangements;Eligible for Feed-in Tariff until December 2033. An online Data Room is available containing detailed information regarding historic accounts, service agreements, Feed-in Tariff, generation data and other pertinent data.