None
TL
Good news from PM Péter Magyar: Paks NPP may operate longer than thought
['Daily News Hungary']
DailyNewsHungary
Cooling water volume could be sufficient to keep the last turbine operating at the Paks nuclear power plant through Monday or even Tuesday, Prime Minister Péter Magyar said in a video message posted on Facebook.
Péter Magyar: Paks NPP may operate for daysKeeping the block — generating 240 MW at present — online is “very good news”, Péter Magyar said.
Output of the Paks NPP has gradually been scaled back over the past week as water levels on the Danube — used to cool the plant — reached record lows.
Source: Paks Nuclear Power Plant / Facebook“The full guarantee of nuclear safety is a basic expectation from which no one can deviate; that will always remain the top priority,” the prime minister stressed.
Both the prime minister and the group leaders have accepted the invitation.