None
EN
A round of applause for Robertson Construction as they complete work at The King’s
['Phyllis Stephen', 'Founding Editor Of The Edinburgh Reporter.', 'Edinburgh-Born Multimedia Journalist', 'Var Molongui_Authorship_Byline_Params', 'Byline_Prefix', 'Byline_Suffix', 'Byline_Separator', 'Byline_Last_Separator', 'Byline_Link_Title', 'View All Posts By']
The Edinburgh Reporter
The curtain rises today on the newly levelled stage at Edinburgh adored King’s Theatre, as Capital Theatres welcomes audiences back through the doors of following a massive restoration project.
More than 50 Robertson supply chain partners were involved in the project, with dramatic upgrades throughout the 1,125-seat, 9,184m² venue.
We wish Capital Theatres every success as they welcome audiences back to experience the magic of the King’s once again.”
David Cairns, Regional Managing Director, Robertson Construction Central East, said: “Every stage of this project required exceptional care, craftsmanship and collaboration.
© Anneleen Lindsay for Capital Theatres 2026© Anneleen Lindsay for Capital Theatres 2026© Anneleen Lindsay for Capital Theatres 2026© Anneleen Lindsay for Capital Theatres 2026Staircase to the upper circle seating at the refurbished King’s Theatre delivered by Robertson ConstructionLike this: Like Loading…