When we first reported September 24 on the all-way stop that appeared unannounced earlier that day at 44th/Oregon in The Junction, we promised to follow up with SDOT to ask what led to its installation, and if any others were on the way. After evaluating the location using our standard criteria — including traffic volumes, pedestrian activity, and proximity to the business district — it met the threshold for all-way stop control and was approved. Given the safety concerns raised and strong community support, we prioritized moving quickly once the intersection met the criteria. The new stop signs were installed on Wednesday (9/24), and “Traffic Revision Ahead” signs were placed on Friday (9/26). We recognize the lag between installation and signage and are updating our process so that advance warning signs will be in place at the same time as new stop signs going forward.