The steel frame is now in place at Click, Letchworth, a scheme by Wrenbridge and Bridges Fund Management. At the Golden Bolt Ceremony, held to mark the occasion, Alistair Dunsdon, director at Wrenbridge, said: "We are delighted to have reached this significant project milestone, alongside our partner Bridges, contracting partner MCS and the entire project team. Steel frame milestone reached for Letchworth development (Image: Supplied)"We are excited to be delivering another best-in-class scheme for occupiers at Click, Letchworth." Located in Letchworth, the development will deliver three industrial and logistics units ranging from 26,522 to 61,677 sq ft, with completion expected by late 2026. Henry Pepper, partner at Bridges Fund Management, said: "Click Letchworth is shaping up to be another great example of our commitment to delivering well-connected, highly sustainable industrial schemes that offer lower costs and reduced emissions for tenants."