None
EN
Opening date revealed for swimming pool at GRID Braehead
['Aidan Macdonald']
Glasgow Times | News
It is now advertised that the pool will be available to punters in the Autumn.
The £1million purpose built swim centre is designed specifically for children aged 0–11 to learn.
There is 31-degree heated pool, air-conditioned viewing lounge and changing rooms.
The Braehead site will become the brand’s 16th purpose-built venue in the UK and its second in Scotland, following its existing centre in Coatbridge.
The project is expected to create up to 50 new jobs, including roles for managers, operational staff and swimming instructors.