None
EN
Major Oxfordshire A-road set close in August
['Larissa Hurt']
Herald Series | News
Resurfacing works on the A34 are set close the road for a 6 week period.
Highways England are resurfacing the road on the A34 Southbound from the Peartree roundabout to Marcham Interchange.
Traffic is expected to be diverted down from Oxford to Berinsfield and then along the A415 over Abingdon Bridge and through to Marcham Interchange.
For the second phase of the works, the alternative route for traffic is A423 East, A4074 South, A415 West to A34.
Exemptions are included for the works traffic and the emergency vehicles.