(File Photo of Road Work Ahead Sign)Noah Haswell, Beaver County Radio News(Beaver County, PA) PennDOT District 11 announced that a lane closure on westbound I-376 (Beaver Valley Expressway) in Potter and Vanport townships will continue. Traffic on westbound I-376 will still be reduced to a single-lane between the Monaca/Shippingport (Exit 39) interchange and Beaver (Exit 38B) exit, and along the Vanport Bridge through early September around-the-clock. Operations to both steel repairs and painting operations will continue to be conducted by crews. Operations westbound started on March 28th. Restrictions eastbound are expected to continue through late October.