None
EN
Viking maps out US tungsten processing pathway
['Murray Ward']
Sydney Morning Herald - Business
AdvertisementSponsored BusinessCompaniesBulls N' Bears Viking maps out US tungsten processing pathway Brought to you by BULLS N’ BEARS Murray Ward July 30, 2026 — 4:37pm Save You have reached your maximum number of saved items.
The study, completed by Mineral Technologies, outlines a process for a 300,000-tonne-per-annum (tpa) plant based on established tungsten processing practices.
A 3D render of the conceptual 300,000-tonne-per-annum modular processing facility designed for Viking Mines’ Linka tungsten project in Nevada, USA.
Notably, the processing study was based on a conservative metallurgical recovery of 60 per cent of scheelite, the tungsten-bearing mineral, into a 50 per cent tungsten trioxide concentrate.
For Viking, having a clear processing pathway mapped out this early in the game is a solid piece of de-risking that could pay dividends down the track.