Additional shorter Koela intervals of note include 2.4 m @ 6.42 g/t Au in IGBD26-005 and 2.0 m @ 2.58 g/t Au in IGBD26-012. Trenching at Igab continues, focused on supporting follow-up drill targeting, with significant interval highlights including 22.0 m @ 2.13 g/t Au, including 15.0 m @ 3.01 g/t Au, in IGBT26-094 at the Cannibal Creek target, and 3.0 m @ 11.59 g/t Au in IGBT26-113 at Koela East. Highlights of recent trenching at Cannibal Creek include 9.0 m @ 1.33 g/t Au in IGBT26-087, 9.0 m @ 1.37 g/t Au, including 5.0 m @ 2.16 g/t Au, in IGBT26-093, and 22.0 m @ 2.13 g/t Au, including 15.0 m @ 3.01 g/t Au, in IGBT26-094 (see Figure 2 and Table 2). Significant intervals reported at Desiberg (see Figure 3 and Table 1) include 6.9 m @ 0.37 g/t Au and 2.3 m @ 2.49 g/t Au in IGBD26-016, and 8.6 m @ 0.52 g/t Au in IGBD26-017. Included intervals have been calculated using a cut-off of 1.00 g/t Au, a minimum length of 3.0 m and a maximum length of 2.0 m of consecutive internal waste.