TL;DR Germany curtailed over 2,700 GWh of solar generation last year and needs to grow battery storage from roughly 30 GWh to 100–170 GWh by 2030. As the first energy deployment inside Lava Network’s Tokenization Sandbox, it is targeting up to €500M for battery assets, starting with a 6 MW project in Saxony-Anhalt. The energy firm is the first live test case for Lava Network’s tokenization sandbox, which says it has fielded 40-plus institutional applications since June. Fraunhofer ISE reckons the roughly 29.8 GWh of battery storage now installed will need to grow to somewhere between 100 and 170 GWh by 2030. Electric Blue has gone live as the first energy deployment inside Lava Network’s Tokenization Sandbox, the decentralized infrastructure protocol announced today.