PennDOT is postponing a project on Route 8 in Clay Township. Work was expected to happen on a bridge on Route 8 just south of Route 138, but that is now being postponed for a later date. This bridge sits above Muddy Creek Flats and wetlands below. No date was announced for when work will happen. The post Route 8 Bridge Work Postponed In Clay Twp.