New drill hole CMA033 intersected 4.81 g/t gold over 21.10 metres , including 4.15 g/t gold over 7.60 metres from 297.40 to 305.00 metres, and including 13.74 g/t gold over 5.00 metres from 310.00 to 315.00 metres. New drill hole CMA029 intersected 3.73 g/t gold over 34.90 metres , including 16.48 g/t gold over 7.50 metres from 318.5 to 326.00 metres. New drill hole CMA025B intersected 3.59 g/t gold over 9.00 metres , including 8.92 g/t gold over 3.50 metres from 224.00 to 227.5 metres. It intersected a mineralized interval with visible gold of 1.51 g/t gold over 4.62 metres within 0.53 g/t gold over 28.00 metres. Article content Cautionary Statement Regarding Forward-Looking Information This press release contains “forward-looking information” within the meaning of applicable Canadian securities legislation.