None
SV
Work on Cooper Creek barge underway, with operational date flagged by DIT
['Paula Thompson']
Stock Journal - NSW
"The ramps, handrails and other fittings are being fabricated in Adelaide and will be fitted to the barge, along with the winches and other components that will drive the barge and lift the ramps," they said.
['barge'
'operational'
'ramps'
'fittings'
'creek'
'handrails'
'underway'
'cooper'
'drive'
'fabricated'
'flagged'
'work'
'lift'
'components'
'fitted'
'date'
'winches'
'dit']