None
EN
Collective Mining Announces 200 Metre Strike Extension at the Ramp Zone with Results Including 50.50 Metres at 5.66 g/t Gold and 13 g/t Silver
['Mr. Ari Sussman Reports']
Junior Mining News
APC106-D2, which is the deepest hole drilled to date into the Ramp Zone, cut 70 metres at 2.00 g/t gold and 5 g/t silver.
Hole APC106-D2 has extended the Ramp Zone deeper and along strike by approximately 200 metres to the east.
Two new large capacity rigs are currently drilling the Ramp Zone with the first directional hole (APC-140D1) cutting potentially favorable Ramp Zone mineralization and the second rig about to begin its first directed hole towards the target.
The intent of the current program is to extend the Ramp Zone at least another 200 metres vertically and laterally along strike.
The hole cut continuous high-grade gold mineralization (see Table 2) with assays results as follows:50.50 metres @ 5.66 g/t gold, 13 g/t silver from 526.10 metres downhole including: 8.80 metres @ 10.56 g/t gold, 23 g/t silver from 528.20 metres downhole and 17.95 metres @ 9.48 g/t gold, 18 g/t silver from 545.05 metres downholeAPC106-D2 was extended to the southwest using the new higher capacity drill rig from a previously failed directional hole from Pad 19.