None
EN
Cabinet clears 86-km 4-lane highway passing through Kaziranga at over Rs 6,000 crore
['Dheeraj Mishra', 'Dheeraj Mishra Is A Principal Correspondent With The Indian Express', 'Business Bureau. He Covers India S Two Key Ministries- Ministry Of Railways', 'Ministry Of Road Transport', 'Highways. He Frequently Uses The Right To Information', 'Rti', 'Act For His Stories', 'Which Have Resulted In Many Impactful Reports.', '... Read More', 'Cdata']
The Indian Express
The project, which has been given a construction period of three years, will be developed in Engineering, Procurement and Construction (EPC) Mode.
(Source: File)The Union Cabinet Wednesday approved the construction of 86-km four-lane highway from Kaliabor to Numaligarh on NH-715 in Assam at a cost of Rs 6,957 crore.
The stretch of the highway lies on the Guwahati-Dibrugarh Corridor, which runs along the Brahmaputra river and passes through Kaziranga National Park.
The project, which has been given a construction period of three years, will be developed in Engineering, Procurement and Construction (EPC) Mode.
Some sections of the existing Kaliabor-Numaligarh section of NH-715 (old NH-37) is two-laned with some parts passing through Kaziranga National Park and densely built up areas of Jakhalabandha and Bokakhat.