Groundworks under way at Baker Barracks for the new single living accommodation [© MoD Crown Copyright]Main contractor Reds10 has started groundworks for three new SLA blocks at Baker Barracks. The prefabricated blocks will provide en-suite accommodation for 315 be army personnel: 242 for junior ranks, 47 for senior non-commissioned officers (SNCOs) and 26 for junior officers. The project will also provide more than 400 car parking spaces with 20 electric vehicle charging points, increasing parking capacity at the barracks. The project is being delivered under the army’s SLA programme by the Defence Infrastructure Organisation (DIO) contracting to off-site construction specialist Reds10. Reds10 defence director Phil Cook said: “Through our close working partnership with the DIO, Reds10 is pioneering advanced technologies and techniques to deliver exceptional value at Baker Barracks.