In September 2025, the Group reached a Final Investment Decision to proceed with the Hole House gas storage project. A Final Investment Decision was taken on Balder Phase VI to develop around 1.5 mmboe (net). COSL Pioneer rig began drilling six wells for Balder Phase V, targeting 3.0 mmboe (net). Total production rate includes gas, oil and natural gas liquids and is rounded to the nearest 100 barrels of oil equivalent per day. I am also pleased to confirm that the Group has taken a Final Investment Decision to proceed with the Hole House gas storage project.