The first emergency 225 Megawatts capacity power barge from Turkey, which was originally scheduled to arrive on Friday morning will now arrive on Saturday morning November 28, 2015. The change in arrival follows the delay in documentation and routine formalities at the Abidjan port where the power barge was offloaded by the Black Marlin, a speed deck cargo ship which transported the power barge from Turkey. Information available indicates that the power barge which has set sail and is being pulled by two-speed boats heading to Tema Port will enter Ghanaian waters Thursday, November 26, 2015. Upon arrival, President John Dramani Mahama is expected to formally inaugurate and inspect the power barge in some 10 days. When completed the power plant will generate additional 250 MW into the National Interconnected Transmission System (NITS).