Project cost INR 63,426 crore Sea-link length 42.75 km Number of Lanes 8 (with 4 + 4 lane plan) The project is handled by Mumbai Metropolitan Region Development Authority or MMRDA Route Versova to Virar Other connecting points Charkop 2019 The pre-feasibility report is submitted 2020 Maharashtra State Road Development Corporation starts the project 2021 The Sea Link project is handed over to Mumbai Metropolitan Region Development Authority 2022 National Green Tribulan approves of the plan 2023 The clearance for the project comes from the Coastal Regulation Zone You can enjoy an excellent quality of life with improved infrastructure and connectivity once the Sea Link is ready Versova Posh area of Mumbai, with beautiful beaches and linked to all points of Mumbai Will be linked to Palghar…