Hardly a day goes by without a story about AI data centers here on MDN. Data centers use electricity either from the local grid or generate it themselves on-site. Either way, the electricity almost always comes from gas-fired power plants. Increasingly, the data centers themselves are opting to host their own gas-fired power plants on-site. But there's a problem for data centers with on-site gas needs: Either there isn't a pipeline (yet) to the site, or if there is a pipeline, it's not big enough to flow the gas required.