The following consultancy assignments will be procured under the project:Assessment of the Impact on Livelihood of Specified Project Affected Persons Construction Supervision of Works (Major Works)It is expected that these will be procured during the period November 2025 to May 2026. The following works will be procured under the project:Contract Name Package Description (as per Bill of Quantities) Description of Works per Package Friars Hill Road – Package 1 Cedar Grove Roundabout to Link Road to Marble Hill Road Concrete catch pits, retaining walls, box drains, earthen drains, concrete lining, bus shelters, sidewalks Friars Hill Road – Package 2 Link Road to Marble Hill Road to Summer Lane Junction Major flood mitigation near Woods Mall, box drains, earthen drains, concrete lining, bus shelters, sidewalks Friars Hill Road – Package 3 Summer Lane Junction to Roundabout near YMCA Curb & slipper drains, box drains, earthen drains, concrete lining, sidewalks on grade, covered sidewalks Sir George Walter Highway – Package 4 Airport Junction to Old Parham Road Junction Concrete catch pits, box drains, earthen drains, concrete lining, sidewalks Sir George Walter Highway – Package 5 Old Parham Road Junction to Sir Sidney Walling Highway Roundabout Major floor mitigation, curb & slipper drains, box drains, earthen drains, concrete lining, sidewalks on grade, road surface dressing Friars Hill Road & Sir George Walter Highway – Package 6 Pavement Interventions Road pavement works including asphalting, junctions, and geometric alignment improvement Friars Hill Road & Sir George Walter Highway – Package 7 Traffic Management Works Installation of signage and road marking, inclusive of pedestrian crossingsIt is expected that these will be procured during the period November 2025 to May 2026. The Project Management Implementation Unit of the Ministry of Works is the Executing Agency for the Project. Further details of the project can be obtained by contacting the address below.