Graham has been selected by the City of Calgary to deliver Phase B of the South Bearspaw Feeder main Repairs, continuing our work on one of the city’s most critical water infrastructure projects. The South Bearspaw Feeder Main is recognized by the city as a critical and vulnerable component of Calgary’s drinking water network, requiring urgent replacement to protect regional water security. The project is being delivered in multiple phases, with Phase B extending work westward from 73 Street NW toward the Bearspaw Water Treatment Plant. The project will add a parallel steel pipe of the same size as the existing Bearspaw South Feeder Main. The replacement pipe is anticipated to be completed in December 2026.