None
FR
Brief overnight I-90 traffic delays in Austin planned Feb. 3 for bridge beam placement
['Our Newsroom Occasionally Reports Stories Under A Byline Of', 'Staff.', 'Often', 'The', 'Staff', 'Byline Is Used When Rewriting Basic News Briefs That Originate Official Sources', 'Such As A City Press Release About A Road Closure', 'Which Require Little Or No Reporting. At Times', 'This Byline Is Used When A News Story Includes Numerous Authors Or When The Story Is Formed Aggregating Previously Reported News Various Sources. If Outside Sources Are Used', 'It Is Noted Within The Story.']
Post Bulletin
AUSTIN, Minn. – Motorists on Interstate 90 in Austin will be briefly delayed Feb. 3 from 8 p.m. to 6 a.m., while construction crews place bridge beams on the westbound bridge over the Cedar River, according to the Minnesota Department of Transportation.
The delays are expected to be approximately 15 minutes in duration each time a beam is placed.
A transport truck will move into place on I-90 with State Patrol slowing and stopping traffic in each direction.
Traffic will resume once a beam has been unloaded from the truck, and it moves on.
ADVERTISEMENTTo learn more about the project, visit the MnDOT project website.