The Strand Road in Derry is to benefit from a £680,000 carriageway resurfacing scheme. The scheme will involve the full resurfacing of 750 metres of the four lane carriageway from Queens Quay Roundabout to Meadowbank Avenue. It will also include structural carriageway patching at specific locations, along with resurfacing of sections of the adjoining footway network. The first phase will involve moving lane closures along the length of the scheme, in place on weekdays between 9.30am and 4.30pm. A full road closure will be required for the resurfacing element, with details to be shared as works progress.