Electrical contractors are usually the last trade in to the project design phase, and by then, are competing with mechanical and plumbing systems for space in crowded pathways. The project design “had a Revit model and it was fairly simple to start with, being K-12. Hope project. Its second project using the AI tool, Willow Elementary, also in the Lansing School District, had even better results. Hope project, all from refining and improving use of Augmenta’s generative AI design tool.