ALMATY – The Caspian Pipeline Consortium (CPC) is operating at full capacity, loading two tankers per day, Energy Minister Yerlan Akkenzhenov announced during a Jan. 28 briefing at the Mazhilis (Parliament’s lower chamber). Waves often exceed 2.5 meters during this season, which in previous years has forced us to slow terminal operations as well,” Akkenzhenov said. The minister added that pumping units No. To strengthen operations, the Ministry of Energy has ordered two new pumping units from the United Arab Emirates, with an expected delivery time of around 30 days. In total, about 70 days will be required to fully install them, after which CPC will operate with three pumping units,” Akkenzhenov said.