A crane has lifted heat pumps into position on the roof of the Treatment Centre at Royal Shrewsbury Hospital (RSH) in the next phase of a £16.2m decarbonisation project. A water source heat pump and an air source heat pump were recently delivered to the hospital site and crane lifted into position. - Advertisement -The final two air source heat pumps will be delivered next month. The Shrewsbury and Telford Hospital NHS Trust, which runs the RSH, has partnered with Vital Energi to do the work. “It was great to see this intricate operation to place these pumps on the roof of the Treatment Centre.