TORONTO, Jan. 28, 2026 (GLOBE NEWSWIRE) -- NexGold Mining Corp. (TSXV: NEXG; OTCQX: NXGCF) (“NexGold” or the “Company”) is pleased to announce it has commenced diamond drilling at the Company’s Goliath Gold Complex in Ontario (“Goliath Complex”) (Figure 1). Open pit mineral reserves incorporate 10%, 7% and 9% dilution for Goliath, Goldlund and Miller, respectively. Goliath underground mineral reserves include 5% dilution and 0% loss for development. Goliath underground mineral reserves are reported based on underground mining within designed underground stopes above a mill feed cut-off value of C$107.66/t (inclusive of 15% mining dilution). The Goliath Gold Complex (which includes the Goliath, Goldlund and Miller deposits) is located in Northwestern Ontario.