Woodside Energy Trading Singapore Pte Ltd (Woodside) and Petronas LNG Ltd. (PLL), a subsidiary of Petroliam Nasional Berhad (Petronas), have finalized a fully termed sale and purchase agreement (SPA) for the supply of 1 million tonnes/year (tpy) of LNG to Malaysia from 2028 for a period of 15 years. This finalized sale converts the non-binding heads of agreement (HOA) signed in June 2025 into a binding commitment, which will see Woodside supply LNG from its global portfolio, which may include volumes from the three-train, 16.5 million tpy Louisiana LNG project in the US, sanctioned earlier this year, the company said in a release Sept. 10. Louisiana LNGThe Louisiana LNG development has expansion capacity for two additional LNG trains and is fully permitted for a total capacity of 27.6 million tpy. At the end of this year's first-half, Woodside had signed a long-term feedgas supply agreement for up to 640 bcf, and Train 1 was 22% complete, and the company is targeting first structural steel on site by yearend. First LNG is expected in 2029, as Woodside secured US Federal Energy Regulatory Commission (FERC) approval for an inservice date extension for the LNG plant and Driftwood pipeline to end-2029.