On 8 May 2025, Münzing officially opened its expanded North American production headquarters in Clover, South Carolina. The new 70,339 sq ft (approx. 6,530 m²) facility is located on a 110-acre site adjacent to the company’s existing operations. The expansion includes a 32,000 sq ft, 32-foot-high processing hall, a 26,800 sq ft warehouse equipped with an automated guidewire system for forklift operations, a 10,000 sq ft laboratory, 8,000 sq ft of office and welfare space, a 4,500 sq ft utility building, and a 1,300 sq ft area for tanker unloading. Strengthening production capacity and local supplyThe new facility is designed to increase Münzing’s regional production capabilities across a range of applications.